- Preperation of the base on which Solid parquet installed
- Cement Base: has to be tight, dry, bulked, hard and 3-6 cm, thick. Hardness will be controlled by rubbing a hard material. No track or dust should be formed during rubbing.
- The cracks formed drying or the base (excluding the little ones) have to be repaired.
- The surface of the cement base has to be clean and the paint, pitch and cement remains on the surface of the cement base have to be removed by using steel spatula.
- The level differences on the cement base may be avoided by using a 2 meters long lath on the base on various direction. Level differences should not exceed 3 mm.
- The cement base should not be excessively shaggy in order to praent from excessive consumption of adhesives. The defective surfaces may be evened with levelling base prepared by chemicals not containing water.
- The base has to be cleaned with acid first in case of flooring wooden parquet on bases mode of materials like stone parquet or marble etc. After the acid treatment a precoating with double components will be applied and after this a special base filling will be applied and it will be waited to get dry.
- In case of flooring parquets over formen parquets then these have to be peeled in order to remove their polish.
- At floor heating systems, after the drying of the base the water at heating serpentines will wait at 30-35°C for 2-3 days. The target temperature will be reached with 3-5°C steps after completing the flooring. It has to be taken into consideration that the parquets at the base do have a certain heat transfer features and the limit of 30-35°C not be exceeded
|
|
|
 |
|
 |
|